Skip to main content

Mount Kilimanjaro

5,895 metres • Trekking routes • High-altitude planning

5,895m

Africa's Highest Peak

High altitude

Careful preparation needed

Acclimatisation

Built into the route

3 Routes

Machame, Marangu, Lemosho

Planning a Kilimanjaro climb

At 5,895 metres, Mount Kilimanjaro is Africa’s highest mountain. Kibo, Mawenzi and Shira rise through distinct vegetation zones, from cultivated foothills and montane forest to the alpine summit landscape. Any summit attempt requires preparation, a suitable pace and time for acclimatisation; reaching the summit is never guaranteed.

Before you choose a route

Ask us about guide qualifications, porter welfare, emergency procedures and the acclimatisation plan for your route. We can explain the differences between the itineraries before you decide.

Key Routes

  • Machame Route: A camping route commonly planned over six or seven days.
  • Marangu Route: A hut-based route commonly planned over five or six days.
  • Lemosho Route: A longer camping approach commonly planned over seven or eight days.
Climbers on Kilimanjaro Climbers on Kilimanjaro

Life on the Mountain

Camping on Kilimanjaro

Camping Under the Stars

Camping is part of the Machame and Lemosho routes. Temperatures and conditions change with altitude, so equipment and camp arrangements are confirmed before departure.

Mount Kilimanjaro seen from a nearby town

The summit objective

Summit night is demanding and conditions can change quickly. The guide’s safety decisions and each climber’s health take priority over reaching Uhuru Peak.

Cattle grazing beneath Mount Kilimanjaro

Lower-slope walks & visits

Shorter walks and visits on the lower slopes may be possible. Ask us which routes and local experiences are currently available.

Practical notes

Planning a visit

A climb, not a drive-in destination. The planning that matters most is how many days you give it.

Getting there
Kilimanjaro International Airport (JRO) is the arrival point, with a short transfer to Moshi or Arusha and on to the trailhead.
Suggested stay
7 days on the mountain via Machame, plus a night either side. Six-day versions exist but cut the acclimatisation day.
Best months
January to March and June to October are the drier windows. The long rains from March to May make the forest section hard going.
Altitude
Uhuru Peak stands at 5,895 m. The Machame route covers roughly 62 km gate to gate, passing through rainforest, moorland, alpine desert and glacier.
Fitness
No technical climbing, but consecutive long days at altitude. Reported summit success is markedly higher on the 7-day itinerary than the 6-day, because of that extra acclimatisation day.
Worth knowing
Reaching the summit can never be guaranteed. Altitude affects people unpredictably, and turning back is always a decision your guide may need to make.
Access and mobility
The climb demands consecutive long days on foot at altitude and is not suitable for limited mobility. There is no vehicle access above the gate and no way to shorten a day once you are on the mountain. Shorter walks and visits on the lower slopes may be possible instead — ask us.

Explore the Kilimanjaro itinerary

Review the route, then contact us to discuss preparation, pace and current arrangements.

View the Kilimanjaro & Safari itinerary Contact Us